Intel Pelican Project, Penang


Status

Ongoing

project type

Industrial

Intel’s expansion of a new production facility at the Bayan Lepas Free Industrial Zone and is expected to complete in 2024. Dubbed the Intel Pelican Project, it will have several phases, with the goal for Intel to expand their assembly test manufacturing, die prep capabilities as well as advanced packaging capacity. This includes one of Intel’s largest assembly and test sites, Malaysia’s largest product design and development centre, and one of the only two Intel shared services hubs that support human resources, finance, procurement, information technology and supply chain operations.

Axel Solutions

The largest product design and development centre in Malaysia to date, includes a water tank built to contain up to 6.5 million gallons of water. To ensure minimal shrinkage and excellent crack control while maintaining excellent water tightness of the RC water tank, AXEL crack control and waterproofing admixtures were utilized.

Products Used
Project Partners
Client Intel Electronics (M) Sdn Bhd, Exyte Malaysia Sdn Bhd
Consultant B.L. Tay Architect
Contractor Suhati Sdn Bhd